Skip to content
The Merrimackerel

Roadwork Scheduled on Three North Andover Streets

Public Works issued a clarification that sections of three North Andover roadways are scheduled for work the week of September 28, weather permitting. The projects cover Summer Street between Salem Street and Farnum Street, Marbleridge Road between Salem Street and Johnson Street, and Rea Street between Johnson Street and Chestnut Street.

The town plans to begin on Summer Street, then move to Marbleridge Road, and finish with Rea Street. These segments are included in the Annual Roads and Sidewalk Restoration Program, and full-length restorations are planned to be added to the roadway restoration CIP over the coming years. Motorists should expect delays, detours and raised castings. A town official will be on site during work, and questions can be directed to the engineering department.

Read the original reporting

This summary was written by The Merrimackerel from the reporting above. Read the full stories at their sources.